2015年5月14日星期四

the new ship using linear optimization

As the birthplace of China's modern shipbuilding industry in the "Twelfth Five Year Plan" period, Shanghai planning to fully grasp the market demand for high-end ship independent design, construction technology, significantly enhance the comprehensive competitiveness of the mainstream ship type, form more than 20 meet the latest international well-known brand ship specification requirements, leading the international market demand. Reporter was informed that, today, including million boxes with superior container ships, a new generation of dynamic large-scale liquefied natural gas ship, ship, ship type of geophysical exploration, are gradually from drawings into ship.

big big wisdom

"if we take the structural design of small sized container ship as the entry level of words, then, 16000 TEU (TEU) structure cheap nhl jerseys design of container ship shall be deemed to be a postgraduate level." Shanghai Waigaoqiao Shipbuilding Co., Ltd design R & D staff said.

recently, Waigaoqiao company obtained 3 ship of 16000 TEU container ship construction cheap jerseys contract, breaking the monopoly position in the field of South Korean shipyards. It is the most long ship Shanghai ever built, total box than the world's largest container ships are in operation was also more than about 160 standard box. The captain of 399 meters, 54 meters wide, deck area close to 4 standard football field; the clearance height of 68 meters, equivalent to 23 storey building.

the chief designer Guo Yong pointed out that "if we ship forever just follow others, then, in the market is good background we cheap mlb jerseys may have a single access, but once met a similar to the current range of this market environment, Cheap football jerseys then we will not have any competitive force. Therefore, our ship type development must be able to lead the market, must be done in advance to meet the owners demand for the use."

to design personnel, nearly 400 meters in length, how to design the structure of ship hull, is a fundamental factor in determining the success or failure in the research and development. In order to overcome difficulties, through the design and test of multi wheel, through the extensive use of high strength steel and other methods, the design team finally from multiple scheme selected a most satisfactory, successfully solves the problem of the cabin forepart fatigue, and to design a good effect in the light ship weight and speed etc.. At the same time, the new ship using linear optimization, on the fuel consumption is reduced by about 30% compared with the same type of ship is operating. High and low box can be disordered mixed cabin, hatch can be disordered hanging from, is cheap nba jerseys flexible to container loading and unloading.

123 the next page

没有评论:

发表评论